Designing this bungalow complex was an excellent opportunity for us to implement a fresh technological solution in the project — CLT panels. They are good because they do not require interior finishing: the structural element is designed for use without additional work, which, with a high level of engineering pre-development, significantly speeds up the construction process.
The project was distinguished by the highest level of detail: all wiring was brought out and ran between the cladding and the frame. This was achieved thanks to BIM design, which our bureau specializes in. The cladding uses corten sheets, which change color over time, giving the architecture liveliness and dynamism.